![]() | Only 14 pages are availabe for public view |
Abstract In this document I described the EL ATF power station 750 MW combined cycle, I described the heat recovery steam generator (HRSG) and the steam turbine, my description included the components of heat recovery steam generator and the components of the steam turbine. In this document also I explained the correct methods to operate the heat recovery steam generator and the steps to operate the steam turbine. Also I described the main auxiliaries: condensate pump, service water pump, closed cooling pump, circulation water pump, the steam turbine condenser, the LP feed water pump and HP/IP pump. I explained also how to operate these main auxiliaries. |